|
|
INCLUDES: 6905, 6910, 6915——————6970
To minimize cable deflection, each cable, when properly installed, will have a tension load of at least 300 lbs. Therefore, it's important that frames are designed and built strong enough to support these loads. Review Frame Requirement Detail to help you prepare the railing for cable infill.
We strongly advise against exceeding a 3-inch cable spacing.
We recommend having a post or vertical member (intermediate picket) at least every 3 feet.
Standard Cable Assembly don't require special crimpers or tensioning tools. The basic tool list would include: Electric drill and bits, ViseGrip® pliers, 7/16" wrench for tightening washer nuts and a cut-off disk for trimming ends.
Give us a call if you need assistance, 707-224-9100
Add text, HTML, images, and videos to this tab via product settings